Full re-roof in East Ham, East London

A full re-roof in East Ham on a hipped family home: stripped back to the rafters, a new breathable membrane and new treated battens, hips and valleys set out properly, then re-tiled in new red interlocking tiles on a ventilated dry ridge and dry hips. Completed October 2026 by our own team and photographed on site.

Fully insured roofing company
5.0 rated · 150+ reviews on Bark
Family run & owner led
24hr emergency callout
Free written quotes
Watch the job

The East Ham re-roof in under a minute

Filmed on site by our own team: the strip, the new membrane and battens, the hips and valleys, and the dry ridge.

More real jobs on our YouTube channel.

At a glance

The East Ham project at a glance

Location

East Ham, East London. A hipped family home on a residential street, joined to a neighbouring property with a slate roof.

The roof

Multiple hips, valleys where the roof slopes meet, chimney stacks and a roof window, all on one pitched roof.

The work

Stripped to the rafters, new breathable membrane, new treated battens, new red interlocking tiles, dry ridge and dry hips, lead at the junctions.

Who did it

Our own team, led by owner Cornelius. No subcontractors and no call centre, one point of contact from the first visit to handover.

Completed

October 2026. Scaffold up the day of the inspection, the roof done in two days, exactly as quoted.

Guarantee

Covered by our company workmanship guarantee and backed by a fully insured limited company.

In the customer's words

"I simply can't fault them in any way"

The owner of this East Ham house left a Google review after the job. His words, unedited, tell the story better than we can.

★★★★★ James H., East Ham · Google review, October 2026

The problem. "My house is just shy of a 100 years old and still had its original roof. So due to wear and tear, problems naturally arose and recently the roof started to fall away."

The first call. "Being a Sergeant in the Metropolitan Police, and a Veteran of 12 years in the British Army, I'm overly suspicious and very cautious of who I do dealings with. I did an online request ... and within an hour I received a call from Cornelius, the owner of Seal Pro Roofing Ltd."

The quote. "Next morning Cornelius was at my front door and assessed the roof. He explained all issues/concerns he had, and took time to explain what work would be needed. Which was effectively a completely new roof. He didn't make me feel pressured in any way and gave me a realistic/fair price."

The job. "He told me it would take 2 days, and that's exactly how long it took. He had the scaffolding arranged/installed the same day as his assessment, job started the very next morning and finished the next evening."

The team. "The dozen or so roofers we met throughout the 2 days were very professional, polite and continued to tidy up behind them and taking great care when walking through our home. Cornelius was present at the beginning of the job, during and after to assess his teams work, critiquing it himself to ensure everything was done to the highest standard."

The verdict. "My neighbours were impressed with the end result, approached Cornelius, and now I see Seal Pro Roofing Ltd working on my neighbours house ... I simply can't fault them in anyway. Great job!"

The brief

A busy roof with no room for shortcuts

The house is nearly 100 years old and was still on its original roof, which had started to fall away. This full re-roof in East Ham was on a roof with a lot going on: several hips running down from the ridge, valleys where the slopes meet, chimney stacks, a roof window and a join onto the neighbour's slate roof. Every one of those details is a place where water gets in when a roof is rushed.

Cornelius called back within an hour of the enquiry, inspected the roof the next morning, explained exactly what it needed and why, and put a fair, fixed price in front of the owner with no pressure. The scaffold went up the same day. Our own team started the next morning and had the whole roof stripped and rebuilt from the rafters up by the following evening: two days on the roof, as promised.

Scope of works

  • Scaffold erected around the house with full edge protection
  • Tiles, battens and the old underlay stripped off the whole roof
  • Rafters checked once exposed, before anything new went on
  • New VapR-free breathable roofing membrane laid and lapped across every slope
  • New treated timber battens, gauged and set out to the tile
  • Hips and valleys set out and formed before the tiles went back on
  • Roof re-tiled in new red interlocking tiles, mechanically fixed
  • Ventilated dry ridge and dry hips, clipped and screwed, no mortar
  • Lead dressed in where the hips meet the ridge
  • Tiles cut and fitted around the chimney stacks and the roof window
  • Neat finish where the new roof meets the neighbour's slate roof
  • Site cleared and gutters left clean at handover
Finished re-roof in East Ham with red interlocking tiles, a dry hip, a roof window and the chimney stack
Valleys and hips set out with new battens and breathable membrane on the East Ham re-roof
Two hips and a valley meeting, set out on new membrane and battens before a single tile went back on.
The detail that matters

Why hips and valleys make or break a re-roof

On a simple two-slope roof, tiling is mostly straight runs. On a hipped roof like this one, every hip and every valley means cut tiles, angled battens and a junction that has to shed water perfectly for decades.

A valley is where two slopes pour their rain into one channel. It carries more water than any other part of the roof, so if it is narrow, badly lapped or blocked with mortar and debris, it overflows under the tiles. A hip is the opposite: an external corner, exposed to wind from two directions, where loose hip tiles are one of the most common storm call-outs we get.

That is why the setting out in the photo on the left took the time it did. The battens are cut in to the hip and valley lines first, the valleys are formed, and only then does the tiling start. Get that right and the roof looks crisp and stays dry. Get it wrong and no amount of new tiles will save it.

Stage by stage

Photo gallery: the East Ham re-roof

Every photo below was taken on site by our own team, in the order the work happened.

New breathable membrane and battens on the stripped roof in East Ham with the tiles stacked on the scaffold
1. Stripped and membraned. The roof back to the rafters, new membrane on, tiles stacked on the scaffold ready.
New treated battens running across the East Ham roof with the street below
2. Battens gauged. New treated battens set out straight and level, to the exact gauge of the tile.
Valley being set out on the East Ham re-roof with battens cut in on both sides
3. Valley formed. Battens cut in to both sides of the valley before tiling, so the channel runs clean.
Hip set out with new battens and VapR-free membrane next to the chimney in East Ham
4. Hips set out. Battens cut to the hip line, with the chimney stack behind.
Two hips and a valley meeting on the East Ham roof, battened and ready for tiles
5. Where the slopes meet. Hips and valleys all set out before the first tile goes on.
The Seal Pro team loading tiles on the scaffold over the street in East Ham
6. Loading out. Our team loading the new tiles up the roof, ready to go on.
Ventilated dry ridge on red interlocking tiles next to the neighbour's slate roof in East Ham
7. Dry ridge. Ridge tiles clipped and screwed over a ventilated ridge, beside the neighbour's slate.
Lead dressed where the hip meets the ridge on the East Ham re-roof
8. Lead at the junction. Lead dressed in where the hips meet the ridge, the point most likely to leak.
Two dry hips meeting with lead at the junction on the East Ham roof
9. Hips finished. Dry hips running down to the eaves, every hip tile mechanically fixed.
Finished hip with the roof window and chimney stack on the East Ham re-roof
10. Around the roof window. Tiles cut and fitted around the roof window and chimney.
Finished hipped roof in East Ham with red tiles and a dry hip
11. Straight lines. Courses running true from ridge to eaves across the whole slope.
The finished East Ham re-roof looking along the dry ridge over the gardens
12. Signed off. The finished roof, looking along the new dry ridge.
Under the tiles

What actually keeps a re-roofed house dry

The tiles are what you see. These are the three parts underneath that decide whether a new roof lasts.

A membrane that breathes

The membrane is the second line of defence under the tiles. A modern breathable membrane stops wind-driven rain getting through but lets moisture from the house escape, so the loft does not run with condensation and the rafters stay dry.

Ridges and hips fixed, not bedded

BS 5534, the British Standard for slating and tiling, requires ridge and hip tiles to be mechanically fixed rather than held by mortar alone. Every ridge and hip tile here is clipped and screwed. No mortar to crack, no tiles working loose in a gale.

Air moving at the top

A ventilated dry ridge lets air move through the top of the roof. Air that moves carries moisture out with it, and a roof space that stays dry is one that does not rot. Lead at the hip and ridge junctions closes the one gap a dry system cannot.

New red tiled roof meeting the neighbour's slate roof on a house in East Ham
Local knowledge

Re-roofing in East Ham: semis, terraces and the house next door

Most homes in East Ham share a wall and a roof line with a neighbour. That changes how a re-roof has to be planned.

  • Your roof meets theirs. On this job the new tiles run up to the neighbour's slate roof. That joint has to be weathered properly, because water does not care whose roof it came off.
  • Scaffold on a busy street. East Ham streets are tight, with cars parked both sides. A scaffold that stands on the public pavement needs a licence from the council, and the tiles and materials have to be loaded out safely over the pavement.
  • Hips, chimneys and roof windows. Many East Ham houses have hipped roofs, shared chimney stacks and loft conversions with roof windows. Every one is a junction that needs cutting and weathering by hand.

If your East Ham roof has slipped tiles, a sagging line or damp patches in the loft, ask us to look at the whole roof, not just the bit that is leaking. It is the cheapest way to find out whether a repair will do.

The result

A roof rebuilt from the rafters up

Everything is new, top to bottom: breathable membrane, treated battens set to gauge, hips and valleys formed properly. On top, the roof is re-tiled in brand new red interlocking tiles with a ventilated dry ridge and dry hips, lead at the junctions, and every detail around the chimneys and roof window cut and fitted by hand.

The owners had one team, one fixed written quote and one point of contact from start to finish. No subcontractors turning up on day three, no surprises on the invoice.

Cornelius owns Seal Pro Roofing, has over 27 years on the tools and handles every enquiry himself. You speak to him at the first call, he quotes the job and he is the person you deal with until it is signed off.

The finished re-roof in East Ham looking along the dry ridge over the gardens
The finished roof, looking along the new dry ridge.
FAQs

Re-roofing in East Ham: straight answers

Yes. This job is in East Ham, and we quote across East Ham and the surrounding area. Call 01753 330566 or fill in the form and Cornelius will arrange a free inspection.
We get on the roof and look. A few slipped tiles, a loose ridge or a blocked valley are repairs. Slipped tiles across several slopes, sagging lines, rotten battens and old underlay that has torn or gone brittle mean the roof is failing everywhere at once, and a re-roof is the better spend. If a repair will do the job, we will tell you that instead of selling you a new roof.
Your neighbour's roof is not touched, but where the two roofs meet has to be finished and weathered properly, as it was on this job. If the work involves the party wall itself, the Party Wall etc. Act 1996 can apply.
It depends on the size and shape of the roof, how many hips, valleys and chimneys it has, and the tile you choose. Our published 2026 new roof price guide gives you real ranges before we visit, and after the inspection you get a fixed written quote with no surprises.
No. Every job is done by our own team, and Cornelius, the owner, quotes it and stays your contact from start to finish.
Yes. Every re-roof is covered by our company workmanship guarantee, from a fully insured limited company, Seal Pro Roofing Ltd, company number 15914993.
Free written quote

Planning a re-roof in East Ham?

Tell us about the roof and we will arrange a free inspection and a fixed written quote. If a repair will do the job, we will tell you that instead of selling you a new roof.

Get Your Free Roofing Quote

Tell us about the job, we usually reply within the hour.

Cornelius, owner of Seal Pro Roofing
Speak to Cornelius, the ownerHe personally handles every enquiry, no call centres

No spam, no obligation. We only use your details to contact you about your quote.

Prefer to talk? Speak to Cornelius on 01753 330566 or

Expert Roofer Verified memberExpert Roofer Verified member
More real jobs

Other recent projects

Free quote

Ready to Sort Your Roof?

Free written quotes. 24hr emergency callout. A local team rated 5.0 by 150+ homeowners on Bark.

Call Now Free Quote